MECHANICAL & ELECTRICAL SPECIFICATION
ELECTRICAL SYSTEM
MSB 200A X 1 NOS
DB 60A X 2 NOS
DB 30A X 1 NOS
LIGHTING POINT X 100 NOS
13A S/S/O X 40 NOS
AIR-COND POWER POINT X 10 NOS
EMERGENCY LIGHT X 20 NOS
KELUAR SIGN X 12 NOS
TELEPHONE POINT X 3 NOS
DATA POINT X 3 NOS
30A INSOLATOR POINT X 5 NOS
• FIRE PROTECTION SYSTEM
FIRE ALARM SYSTEM
HOSEREEL SYSTEM
HYDRANT SYSTEM
AUTOMATIC SPRINKLER SYSTEM
PORTABLE FIRE EXTINGUISHER
DIRECT LINK TO FIRE BRIGADE
GENERAL SPECIFICATION
• FACTORY HEIGHT : 12 MTRS
• PRODUCTION AREA (NON SUSPENDED SLAB) 40 KN/M2 (APPROXIMATELY)
• OFFICE AREA (LEVEL 2 & 3) 2.5KN/M2
• ROOF STRUCTURE : STRUCTURAL STEEL DESIGNED TO BS 5950
• STANDARD ROOF SHEETS : ZINCALUME METAL ROOF C/W 50MM THICK FIBERGLASS INSULATION
• RAIN WATER DOWN PIPE : EXPOSED 150MM Ø UPVC PIPE
• GUTTER : 0.5MM STAINLESS STEEL GUTTER
• INTERNAL WALL : PRE-CAST WALL OR 115MM THICK COMMON BRICK WALL WITH PLASTER & PAINTED WITH EMULSION PAINT
• EXTERNAL WALL : PRE-CAST WALL OR 115MM THICK COMMON BRICK WALL WITH PLASTER & PAINTED WITH WEATHER BOND PAINT
• GROUND FLOOR : 150MM THK G30 CONCRETE WITH A LAYER OF POLYTHENE SHEET AND BRC A7
• INTERNAL DOORS : TIMBER FLUSH DOOR
• EXTERNAL DOORS : MOLD STEEL DOOR
• WINDOWS : ALUMINIUM FRAMED TOP HUNG WINDOWS
• OFFICE CEILING : 2′ X 4′ GYPSUM PIN HOLE FALSE CEILING
• PRODUCTION CEILING : EXPOSED STRUCTURE (NO CEILING)
• INFRASTRUCTURE – ROAD : 150MM THK REINFORCED CONCRETE ROAD C/W PARKING LOT / ROAD MARKING
• INFRASTRUCTURE – FENCING : COMMON BRICK WALL C/W PLASTER & PAINTED WITH WEATHER BOND PAINT
• INFRASTRUCTURE – GATE : 9M WIDE MILD STEEL SLIDING GATE
• INFRASTRUCTURE – DRAINAGE SYSTEM : CONCEALED PIPE CULVERT DRAIN
• INFRASTRUCTURE – SEWERAGE SYSTEM : SEPTIC TANK C/W VITRIFIED CLAY PIPE (VCP) CONNECT TO WC MAINHOLE
• INFRASTRUCTURE – ANCILLARY BUILDINGS : BIN CENTER
• INFRASTRUCTURE – OSD : RC UNDERGROUND DETENTION TANK